NDT certificate management in the UAE spans MT, PT, UT, RT, VT, and method-specific reporting rules — often under lifting, pressure equipment, and oil & gas client formats. When certificates are Word templates filled manually, method numbering diverges and audit samples expose gaps.
UAE NDT operators need method-scoped workflows, competency-aware assignment, and report-to-certificate data flow — not another folder structure.
NDT certificate flow
Interactive workflow
NDT certificate flow (MT / UT / RT / PT)
Method-scoped job order
Client, asset, NDT method, and acceptance criteria captured upfront.
Spreadsheets vs TIC-native ERP for NDT
Interactive comparison
NDT operations: spreadsheets vs TIC-native ERP
| Capability | Excel + Word | Oryxen |
|---|---|---|
| Method numbering | Separate files per method | Series per method / client |
| Competency check | Tribal knowledge | Competency matrix at assignment |
| Report → certificate | Retype readings | Field data flows forward |
Oryxen supports workflows aligned with accreditation and client frameworks. Oryxen is software and does not grant accreditation, certification, equipment approval, or inspector approval.
Explore NDT inspection software UAE or book a workflow audit.
Continue exploring